Skip to content
ln-200-scope-decomposer logo

Scope Decomposer (Top Orchestrator)

ln-200-scope-decomposer

Orchestrates full decomposition (scope → Epics → Stories) by delegating ln-210 → ln-220. Sequential Story decomposition per Epic. Epic 0 for Infrastructure.

SKILL.md

Full skill instructions

Scope Decomposer (Top Orchestrator)

Top-level orchestrator for complete initiative decomposition from scope to User Stories through Epic and Story coordinators.

Overview

What This Skill Does

Coordinates the complete decomposition pipeline for new initiatives:

  • Auto-discovers Team ID from kanban_board.md
  • Phase 1: Discovery (Team ID)
  • Phase 2: Epic Decomposition (delegates to ln-210-epic-coordinator)
  • Phase 3: Story Decomposition Loop (delegates to ln-220-story-coordinator per Epic, sequential)
  • Phase 4: Summary (total counts + next steps)

When to Use This Skill

This skill should be used when:

  • Start new initiative requiring full decomposition (scope → Epics → Stories)
  • Automate Epic + Story creation in single workflow
  • Prefer full pipeline over manual step-by-step invocation
  • Time-efficient approach for new projects (2-3 hours end-to-end)

Alternative: For granular control, invoke coordinators manually:

  1. ln-210-epic-coordinator - CREATE/​REPLAN Epics
  2. ln-220-story-coordinator - CREATE/​REPLAN Stories (once per Epic)

When NOT to Use

Do NOT use if:

  • Initiative already has Epics → Use ln-210-epic-coordinator REPLAN mode instead
  • Need to replan existing Stories → Use ln-220-story-coordinator REPLAN mode per Epic
  • Only need Epic creation → Use ln-210-epic-coordinator directly
  • Only need Story creation for specific Epic → Use ln-220-story-coordinator directly

Core Concepts

Orchestrator Pattern

ln-200-scope-decomposer is a pure coordinator - it does NOT execute work directly:

  • ✅ Discovers context (Team ID)
  • ✅ Makes routing decisions (which coordinator to invoke)
  • ✅ Delegates all work via Skill tool (ln-210, ln-220)
  • ✅ Manages workflow state (Epic creation → Story loop)
  • ❌ Does NOT research project docs (ln-210 does this)
  • ❌ Does NOT generate Epic/​Story documents (ln-210/​ln-220 do this)
  • ❌ Does NOT create Linear issues (coordinators do this)
  • ❌ Does NOT prompt user (coordinators handle all user interaction)

Coordinators:

  • ln-210-epic-coordinator: Creates 3-7 Epics (Epic 0 for Infrastructure if applicable, Epic 1-N for business domains)
  • ln-220-story-coordinator: Creates 5-10 Stories per Epic (with standards research via ln-001)

Sequential Story Decomposition

CRITICAL CONSTRAINT: Epic N Stories MUST complete before Epic N+1 starts.

Why sequential?

  • ln-220-story-coordinator includes user interaction (Story preview confirmation)
  • Interactive dialog cannot be parallelized (user must review each Epic's Stories)
  • Ensures Epic N Stories are approved and created before starting Epic N+1

Example: 6 Epics → ln-220 invoked 6 times sequentially (Epic 0 → Epic 1 → Epic 2 → ... → Epic 5)

Infrastructure Epic = Epic 0

Reserved number: Epic 0 is reserved for Infrastructure Epic (if proposed by ln-210).

Numbering:

  • IF Infrastructure Epic exists → Epic 0 (Infrastructure), Epic 1-N (business domains)
  • ELSE → Epic 1-N (business domains only)

Decision: ln-210-epic-coordinator Phase 1 Step 3 automatically determines if Infrastructure Epic is needed (new project, multi-stack, security/​monitoring requirements).

Auto-Discovery

Team ID: Auto-discovered from docs/​tasks/​kanban_board.md Linear Configuration table (see CLAUDE.md "Configuration Auto-Discovery").

Fallback: If kanban_board.md missing → ln-210-epic-coordinator will ask user directly


Workflow

Phase 1: Discovery (Automated)

Auto-discovers Team ID from docs/​tasks/​kanban_board.md.

Validation:

  • Team ID exists in kanban_board.md
  • If missing → Skip (ln-210 will request from user)

NO user confirmation at orchestrator level - coordinators handle all user interaction.

Output: Team ID (or None if not found)

Phase 2: Epic Decomposition (Delegated)

Objective: Create all Epics for initiative.

Delegate to ln-210-epic-coordinator:

🔄 [ORCHESTRATOR] Phase 2: Delegating Epic creation to ln-210-epic-coordinator

Skill(skill: "ln-210-epic-coordinator")

ln-210-epic-coordinator will:

  • Phase 1: Research project docs (requirements.md, architecture.md, tech_stack.md)
  • Phase 2: Auto-propose domains + Infrastructure Epic (Epic 0) → User confirms domain list
  • Phase 3: Build IDEAL Epic plan (Epic 0-N)
  • Phase 5a: Auto-extract Q1-Q4 from docs → Generate ALL Epic documents → Show batch preview → User confirms → Create all Epics
  • Return: Epic URLs + summary

After completion: Epics created in Linear, kanban_board.md updated.

Output: 3-7 Epics created (Epic 0 for Infrastructure if applicable, Epic 1-N for business domains)

Phase 3: Story Decomposition Loop (Sequential, Delegated)

Objective: Create Stories for EACH Epic (sequential processing).

Sequential Loop Logic:

FOR EACH Epic (Epic 0, Epic 1, ..., Epic N):
    1. Invoke ln-220-story-coordinator for current Epic
    2. Wait for completion
    3. Verify Stories created in kanban_board.md
    4. Move to next Epic

Invocation per Epic:

🔄 [ORCHESTRATOR] Phase 3: Delegating Story creation for Epic N to ln-220-story-coordinator

Skill(skill: "ln-220-story-coordinator", epic_number="Epic N")

ln-220-story-coordinator will (per Epic):

  • Phase 1: Auto-extract Q1-Q6 from Epic + Fallback search (requirements.md, tech_stack.md)
  • Phase 2: Research standards via ln-001-standards-researcher (auto)
  • Phase 3: Build IDEAL Story plan (5-10 Stories)
  • Phase 4a: Generate ALL Story documents → Show preview → User confirms → Create all Stories
  • Return: Story URLs + summary

Sequential constraint explanation:

  • ln-220 includes user interaction (Story preview confirmation)
  • Cannot parallelize - user must review each Epic's Stories sequentially
  • Epic N Stories approved → Epic N+1 Stories generated

After each Epic: Stories created in Linear, kanban_board.md updated.

Output: 30-60 Stories total (5-10 per Epic × 3-7 Epics)

TodoWrite format (mandatory): Add phases and Epic iterations to todos before starting:

- Phase 1: Discovery (in_progress)
- Phase 2: Delegate to ln-210-epic-coordinator (pending)
- Phase 3: Delegate to ln-220 for Epic 0 (pending)
- Phase 3: Delegate to ln-220 for Epic 1 (pending)
- Phase 3: Delegate to ln-220 for Epic 2 (pending)
... (one todo per Epic)
- Phase 4: Summary (pending)

Mark each as in_progress when starting, completed when coordinator returns success.

Phase 4: Summary and Next Steps

Objective: Provide complete decomposition overview.

🔄 [ORCHESTRATOR] Phase 4: Full decomposition complete

Initiative Decomposition Summary:
- Epics created: N Projects (Epic 0: Infrastructure [if exists], Epic 1-N: Business domains)
- Stories created: M Issues (breakdown per Epic)
- Location: docs/​tasks/​kanban_board.md

Next Steps:
1. Run ln-310-story-validator to validate all Stories
2. Use ln-400-story-executor to process each Story (tasks → execution → Done)
   OR use ln-300-task-coordinator to create tasks manually for each Story

Output: Summary message with full decomposition results


Critical Rules

1. Pure Orchestrator Pattern

Orchestrator responsibilities:

  • ✅ Discovery (Team ID)
  • ✅ Routing decisions (which coordinator to invoke, when)
  • ✅ Sequential loop management (Epic 0 → Epic 1 → ... → Epic N)
  • ✅ Summary aggregation (count Epics, Stories)

Coordinator responsibilities (NOT orchestrator):

  • ❌ Research project docs → ln-210
  • ❌ Auto-extract Epic/​Story info → ln-210/​ln-220
  • ❌ Generate Epic/​Story documents → ln-210/​ln-220
  • ❌ Create Linear issues → ln-210/​ln-220
  • ❌ User interaction (confirmations) → ln-210/​ln-220

2. Sequential Story Decomposition

HARD RULE: Epic N Stories MUST complete before Epic N+1 starts.

Rationale: ln-220 includes user interaction (Story preview confirmation). Interactive dialog cannot be parallelized.

Example: 6 Epics → 6 sequential ln-220 invocations (Epic 0 → Epic 1 → ... → Epic 5)

3. No User Prompts at Orchestrator Level

Orchestrator does NOT prompt user:

  • ❌ NO "Proceed with decomposition?" confirmation (redundant - coordinators already confirm)
  • ❌ NO time estimates (misleading - actual time varies)
  • ❌ NO Epic/​Story previews (coordinators handle this)

All user interaction delegated to coordinators:

  • ln-210 Phase 2: Domain approval (USER CONTROL POINT 1)
  • ln-210 Phase 5a: Epic batch preview (USER CONTROL POINT 2)
  • ln-220 Phase 4a: Story preview per Epic (USER CONTROL POINT 3, N times)

4. Epic 0 for Infrastructure

Reserved number: Epic 0 is reserved for Infrastructure Epic.

Decision point: ln-210-epic-coordinator Phase 1 Step 3 automatically determines if Infrastructure Epic needed.

Numbering: Epic 0 (if Infrastructure), Epic 1-N (business domains)


Definition of Done

Before completing work, verify ALL checkpoints:

✅ Team ID Discovered (Phase 1):

  • Team ID loaded from kanban_board.md OR skipped (ln-210 will request)

✅ Epic Decomposition Complete (Phase 2):

  • Delegated to ln-210-epic-coordinator
  • 3-7 Epics created (Epic 0 for Infrastructure if applicable, Epic 1-N for business domains)
  • Epic URLs returned
  • Epics visible in kanban_board.md

✅ Story Decomposition Complete (Phase 3):

  • Delegated to ln-220-story-coordinator for EACH Epic (sequential)
  • 5-10 Stories created per Epic
  • Story URLs returned for each Epic
  • All Stories visible in kanban_board.md (Backlog section)

✅ Summary Provided (Phase 4):

  • Total counts displayed (Epics, Stories, breakdown per Epic)
  • kanban_board.md location shown
  • Next steps provided (validation, task creation)

Output: Summary message with full decomposition results (Epics + Stories per Epic)


Integration with Ecosystem

Called By

Users directly: "Decompose initiative: [initiative name]" or "Create epics and stories for [project]"

Calls (via Skill tool)

  • ln-210-epic-coordinator (Phase 2) - CREATE mode (batch Epic creation with batch preview)
  • ln-220-story-coordinator (Phase 3, sequential loop) - CREATE mode per Epic (Story creation with preview)

Downstream

After ln-200-scope-decomposer completes:

  • ln-310-story-validator - validates all created Stories before task creation
  • ln-400-story-executor - processes each Story (tasks → execution → Done)
    • OR ln-300-task-coordinator - creates tasks manually for each Story

Best Practices

Orchestrator Responsibilities

DO:

  • ✅ Auto-discover Team ID
  • ✅ Delegate to coordinators
  • ✅ Manage sequential loop (Epic 0 → Epic 1 → ... → Epic N)
  • ✅ Aggregate summary (count Epics, Stories)

DON'T:

  • ❌ Research project docs (ln-210 does this)
  • ❌ Generate documents (coordinators do this)
  • ❌ Create Linear issues (coordinators do this)
  • ❌ Prompt user (coordinators handle all interaction)

Coordinator Trust

Trust coordinator results: Coordinators return summary, orchestrator doesn't re-verify.

Error handling: If coordinator returns error, report to user and stop pipeline.

Sequential Processing

Epic creation first: Phase 2 creates ALL Epics before Phase 3 starts (ensures Epic IDs available).

Story creation sequential: Phase 3 processes Epics one-by-one (Epic N Stories → Epic N+1 Stories).

Rationale: User interaction in ln-220 requires sequential processing (cannot parallelize confirmations).

Time Estimates

Realistic estimate: 2-3 hours for full decomposition (6 Epics × 7 Stories avg = 42 Stories).

Breakdown:

  • Phase 2 (Epic creation): 30-45 min (batch preview reduces time)
  • Phase 3 (Story creation): 1.5-2 hours (6 Epics × 15-20 min per Epic)
  • Phase 4 (Summary): 2 min

Do NOT provide time estimates to user - varies based on project complexity and user response time.


Example Usage

Request:

"Decompose initiative: E-commerce Platform"

Execution:

  1. Phase 1: Discovery

    • Team ID loaded from kanban_board.md
  2. Phase 2: Epic Decomposition

    • Invoke ln-210-epic-coordinator
    • ln-210 creates 6 Epics:
      • Epic 11 (Infrastructure Epic 0 pattern)
      • Epic 12-16 (business domains)
    • Output: 6 Epic URLs
  3. Phase 3: Story Decomposition Loop (Sequential)

    • Epic 11: Invoke ln-220 → 6 Stories (US017-US022)
    • Epic 12: Invoke ln-220 → 7 Stories (US023-US029)
    • Epic 13: Invoke ln-220 → 5 Stories (US030-US034)
    • Epic 14: Invoke ln-220 → 6 Stories (US035-US040)
    • Epic 15: Invoke ln-220 → 7 Stories (US041-US047)
    • Epic 16: Invoke ln-220 → 5 Stories (US048-US052)
    • Output: 36 Stories total
  4. Phase 4: Summary

    🔄 [ORCHESTRATOR] Full decomposition complete
    
    Initiative: E-commerce Platform
    - Epics created: 6 Projects (Epic 11: Infrastructure, Epic 12-16: Business domains)
    - Stories created: 36 Issues
      - Epic 11: 6 Stories
      - Epic 12: 7 Stories
      - Epic 13: 5 Stories
      - Epic 14: 6 Stories
      - Epic 15: 7 Stories
      - Epic 16: 5 Stories
    - Location: docs/​tasks/​kanban_board.md
    
    Next Steps:
    1. Run ln-310-story-validator to validate all Stories
    2. Use ln-400-story-executor to process each Story (tasks → execution → Done)
    

Result: 6 Epics + 36 Stories created through full pipeline automation


Chat Output Prefix

Use emoji prefix for visual differentiation:

  • 🔄 [ORCHESTRATOR] - ln-200-scope-decomposer (top orchestrator)

Purpose: Helps users track orchestrator progress when delegating to multiple coordinators.


Version: 2.0.0 (BREAKING: Complete rewrite following ln-400 Pure Orchestrator Pattern. Removed Phase 1 User Confirmation. Removed false "AUTOMATIC" claims. Added Epic 0 for Infrastructure. Added Sequential Story Decomposition explanation. Added Critical Rules section. Realistic time estimates (2-3h). Removed REPLAN mode (not applicable to top orchestrator - use ln-210/​ln-220 REPLAN modes instead).) Last Updated: 2025-11-20

More Productivity & Planning skills

brainstorming logo
Productivity & Planning

brainstorming

Structured design dialogue that validates ideas before implementation begins.

295.4K 385.7K
View
ui-ux-pro-max logo
Productivity & Planning

ui-ux-pro-max

Comprehensive design intelligence for web and mobile UI/UX across 10 technology stacks.

133.1K 383.9K
View
writing-plans logo
Productivity & Planning

writing-plans

Comprehensive implementation plans for multi-step tasks, breaking down specs into bite-sized, testable steps.

295.4K 268K
View
using-superpowers logo
Productivity & Planning

using-superpowers

Introduction to the obra skills system with mandatory skill invocation rules and best practices.

295.4K 259.8K
View
executing-plans logo
Productivity & Planning

executing-plans

Execute a written implementation plan with critical review and task checkpoints.

295.4K 229.1K
View
dispatching-parallel-agents logo
Productivity & Planning

dispatching-parallel-agents

Delegate independent tasks to specialized agents working concurrently with isolated context.

295.4K 206.3K
View
using-git-worktrees logo
Productivity & Planning

using-git-worktrees

Isolated git worktrees with smart directory selection and safety verification.

295.4K 205.2K
View
webapp-testing logo
Productivity & Planning

webapp-testing

Toolkit for interacting with and testing local web applications using Playwright. Supports verifying frontend functionality, debugging UI behavior, capturing browser screenshots, and viewing browser logs.

179.7K 170.6K
View
content-strategy logo
Productivity & Planning

content-strategy

Plan searchable and shareable content that drives traffic, builds authority, and generates leads.

53.3K 150.9K
View
repo-intake-and-plan logo
Productivity & Planning

repo-intake-and-plan

README-first repository scanner that extracts commands and classifies reproduction candidates without executing them.

497 139.6K
View
marketing-ideas logo
Productivity & Planning

marketing-ideas

Brainstorm and prioritize marketing strategies tailored to your SaaS stage, budget, and goals.

53.3K 137.2K
View
site-architecture logo
Productivity & Planning

site-architecture

Plan and optimize your website's page hierarchy, navigation, URL structure, and internal linking.

53.3K 112.8K
View

Productivity AI tools

Vimcal logo
Productivity

Vimcal

The world's fastest calendar for remote work

Free
View
SaveDay logo
Productivity

SaveDay

Capture, organize, and utilize your knowledge effortlessly.

Free
View
Any Summary logo
Productivity

Any Summary

Instant Summaries of Audio & Video Interviews with AnySummary

Freemium
View
M
Productivity

Map This

Transform PDFs into engaging mind maps.

Freemium
View
ChatPDF logo
Productivity

ChatPDF

Chat with any PDF instantly

Free
View
I
Productivity

intellisay

Create an optimal daily plan using your voice

Paid
View
A
Productivity

Aurora AI

A productivity platform to centralize organizational knowledge and workflows with contextual AI assistance.

Paid
View
AskYourPDF logo
Productivity

AskYourPDF

AskYourPDF Pricing Plans: Tailored to Your Needs

Free
View