Skip to content
gate logo

Gate

gate

Verification before completion claims. Use when about to say "done", "fixed", or "complete". Runs checklist by workflow type with evidence requirements.

SKILL.md

Full skill instructions

gate

Verify before claiming completion.

Trigger

Before claiming: "done", "fixed", "complete", "working", "ready"


Pre-Work Gate (Before Starting)

Run before substantial work begins. Blocks execution if missing.

□ Verification method locked (not "assumption")
  → What type: execution output / observation / measurement?
  → What evidence will you show?

□ At least 2 "must NOT" criteria exist
  → What should this NOT do?
  → What scope should NOT expand?

□ Fit score determined workflow shape
  → <25: BLOCKED - clarify first
  → 25-29: Colleague-shaped (iterate each step)
  → 30-39: Tool-with-review (checkpoint major steps)
  → 40+: Tool-shaped (milestones only)

If any missing: STOP. Complete before proceeding.


Post-Work Gate (Before Claiming Done)

Workflow A: Build

□ Feature executes without errors (show output)
□ Edge cases tested (empty, null, boundary)
□ Rollback tested if Type 2B/​1
□ Dependencies verified

Workflow B: Debug

□ Root cause identified with evidence
□ Fix tested and resolves symptom
□ Prevention added (test/​automation/​guard)
□ Related bugs checked (same class)

Workflow C: Refactor

□ Existing tests pass unchanged
□ Behavior identical (output comparison)
□ Deletion complete (no orphans)
□ No new abstraction without justification

Verification Types

TypeDescriptionSufficient for SHIP?
execution outputRan command, showed result✓ Yes
observationScreenshot, debugger session✓ Yes
measurementMetrics, benchmark data✓ Yes
reasoned inferenceLogic-based conclusion⚠️ Flag, don't block
code reviewInspection only⚠️ Weak
assumptionNot verified⚠️ Flag with warning

Default: Require execution output, observation, or measurement before completion claims.

Boundary

Gates advise, never prevent. User owns their work.

  • If user says "I'm confident" → flag concern, proceed
  • If user says "skip gates" → proceed without verification demands
  • Never invalidate user's assessment of their own work

Gate exists to surface risk, not to block legitimate intuition.

Verification Plan

Before claiming completion, define how you'll verify:

Verification TypeEvidence RequiredTime Cost
Execution outputCommand output, test results< 1 min
ObservationScreenshot, debugger inspection1-5 min
MeasurementMetrics, benchmarks, profiling5-15 min
Code reviewManual inspection onlyVariable
AssumptionNo verification0 (blocks SHIP)

Verification Requirements by Stakes

StakesMinimum Verification
HighExecution output + Observation
MediumExecution output
LowCode review acceptable

Anti-Footgun Rules

  • Never claim "done" with only assumptions
  • "It compiles" is not verification
  • "Tests pass" requires showing test output
  • If verification would take > 15 min, that's a smell (task too big)

Anti-Patterns

ClaimProblemRequired
"Should work"SpeculationActual output
"Looks good"No verificationTest results
"Fixed the issue"No proofBefore/​after
"I think this resolves it"No confidence %X-Y% + basis

Incomplete Work

When blocked, state:

  • What's done (with evidence)
  • What's blocking (specific)
  • What's remaining

Type 2A Exception

Trivial changes (< 1 min rollback): completion allowed without full gate. Document undo command.

Common Rationalizations (All Wrong)

ThoughtReality
"The tests passed"Tests ≠ verification. Did you run the ACTUAL command?
"It should work""Should" = assumption. Show evidence.
"I already checked"When? Show the output.
"The user is waiting"Rushed verification = rework later.
"It's a simple change"Simple changes break production too.
"I'm pretty sure it works"Pretty sure ≠ evidence. Run it.