Forensic Unplanned Work Analysis

forensic-unplanned-work

Use when understanding velocity issues, measuring quality improvement efforts, tracking interrupt work, or quantifying technical debt impact - monitors trends in unplanned work (bugs, hotfixes) and correlates with code hotspots

SKILL.md

Full skill instructions

Forensic Unplanned Work Analysis

🎯 When You Use This Skill

State explicitly: "Using forensic-unplanned-work pattern"

Then follow these steps:

  1. Calculate unplanned work ratio (bug fixes / total commits)
  2. Identify interrupt hotspots (files causing most unplanned work)
  3. Track trends over time (ratio increasing = quality degrading)
  4. Cite research when presenting findings (>40% unplanned = low morale)
  5. Suggest integration with hotspot-finder and refactoring-roi at end

Overview

Unplanned work analysis tracks interrupt-driven work (bugs, hotfixes, urgent patches) vs planned work (features). Research shows teams spending >40% on unplanned work have low morale and reduced velocity.

This analysis reveals:

  • Unplanned work ratio - % of commits fixing problems vs building features
  • Interrupt hotspots - Files generating most bug fixes
  • Velocity impact - Time lost to fire-fighting
  • Quality trends - Is unplanned work increasing or decreasing?
  • ROI of quality - Reducing bugs increases feature delivery

Core principle: Unplanned work = technical debt tax. Every bug fix is time not spent building features.

When to Use

  • Understanding why velocity is declining
  • Measuring impact of refactoring efforts (did bugs decrease?)
  • Quarterly quality health checks
  • Justifying quality investment to executives
  • Post-release analysis (spike in hotfixes?)
  • Before/​after major refactoring validation
  • Diagnosing team morale issues

When NOT to Use

  • Insufficient git history (<6 months unreliable)
  • No commit message conventions (can't distinguish bugs from features)
  • Greenfield projects (no bug history yet)
  • When you need defect prediction (use hotspot analysis)
  • When you need bug severity (requires issue tracker data)

Core Pattern

⚡ THE UNPLANNED WORK FORMULA (USE THIS)

This is the interrupt work metric - don't create custom classifications:

Unplanned Work Ratio = bug_fix_commits / total_commits × 100

Classification:
  - >40%:  CRITICAL (team in fire-fighting mode)
  - 30-40%: HIGH (significant interrupt overhead)
  - 20-30%: MODERATE (normal for mature systems)
  - 10-20%: GOOD (quality-focused development)
  - <10%:  EXCELLENT (greenfield or very high quality)

Interrupt Hotspot = File with:
  - >10 bug fix commits per year AND
  - Bug fix ratio >50% (more fixes than features)

Velocity Impact = Unplanned % × Team Capacity
  Example: 35% unplanned × 5 developers = 1.75 FTE firefighting

Critical: >40% unplanned work correlates with low team morale and declining velocity.

📊 Research Benchmarks (CITE THESE)

Always reference research when presenting unplanned work findings:

FindingImpactSourceWhen to Cite
High unplanned work>40% = low moraleDevOps Research"Research shows >40% unplanned work correlates with low morale (DevOps)"
Quality investment ROI10% less bugs = 15-20% more featuresGoogle SRE"Reducing unplanned work 10% increases delivery 15-20% (Google SRE)"
Hotspot correlation80-90% bugs from 20% of filesPareto Principle"80-90% of bugs come from 20% of files (Pareto)"

Always cite the source when justifying quality improvement investment.

Quick Reference

Essential Git Commands

PurposeCommand
Count bug fixesgit log --since="12 months ago" --grep="fix|bug|hotfix" --oneline | wc -l
Total commitsgit log --since="12 months ago" --oneline | wc -l
Bug fixes per filegit log --since="12 months ago" --grep="fix|bug" --name-only --format="" | sort | uniq -c | sort -rn
Monthly trendsLoop through months counting bug fix vs total commits

Unplanned Work Classification

RatioTeam ImpactClassificationAction
>40%Fire-fighting mode, low moraleCRITICALUrgent quality investment
30-40%Significant interrupt overheadHIGHSchedule refactoring
20-30%Normal for mature systemsMODERATEMonitor trends
10-20%Quality-focused developmentGOODMaintain standards
<10%Greenfield or very high qualityEXCELLENTDocument practices

Commit Classification Keywords

TypeKeywordsExamples
Unplannedfix, bug, hotfix, urgent, patch"fix auth timeout", "hotfix payment crash"
Plannedfeat, feature, add, implement"feat: add dashboard", "implement retry logic"
Refactoringrefactor, improve, optimize"refactor: extract module"

Implementation

Step 1: Classify Commits

Identify unplanned work:

# Pseudocode for commit classification

def classify_commit(commit_message):
    message_lower = commit_message.lower()

    # Unplanned work keywords
    unplanned_keywords = ['fix', 'bug', 'hotfix', 'urgent', 'emergency',
                          'patch', 'issue', 'defect', 'broken']

    # Planned work keywords
    planned_keywords = ['feat', 'feature', 'add', 'implement', 'create']

    # Refactoring keywords
    refactor_keywords = ['refactor', 'improve', 'optimize', 'clean']

    if any(kw in message_lower for kw in unplanned_keywords):
        return 'UNPLANNED'
    elif any(kw in message_lower for kw in refactor_keywords):
        return 'REFACTORING'
    elif any(kw in message_lower for kw in planned_keywords):
        return 'PLANNED'
    else:
        return 'UNKNOWN'

Note: Adjust keywords based on team's commit message conventions.

Step 2: Calculate Unplanned Work Ratio

For time period:

def calculate_unplanned_ratio(since="12 months ago"):
    commits = git_log(since=since)

    unplanned_count = 0
    planned_count = 0
    refactoring_count = 0
    unknown_count = 0

    for commit in commits:
        classification = classify_commit(commit.message)

        if classification == 'UNPLANNED':
            unplanned_count += 1
        elif classification == 'PLANNED':
            planned_count += 1
        elif classification == 'REFACTORING':
            refactoring_count += 1
        else:
            unknown_count += 1

    total = len(commits)
    unplanned_ratio = (unplanned_count / total) * 100 if total > 0 else 0

    return {
        'total_commits': total,
        'unplanned': unplanned_count,
        'planned': planned_count,
        'refactoring': refactoring_count,
        'unknown': unknown_count,
        'unplanned_ratio': unplanned_ratio
    }

Step 3: Identify Interrupt Hotspots

Files causing most unplanned work:

def find_interrupt_hotspots():
    # Get all bug fix commits
    bug_commits = git_log(grep="fix|bug|hotfix", since="12 months ago")

    # Count bug fixes per file
    bug_fixes_per_file = defaultdict(int)
    total_changes_per_file = defaultdict(int)

    for commit in bug_commits:
        for file in commit.changed_files:
            bug_fixes_per_file[file] += 1

    # Get total changes per file for ratio
    all_commits = git_log(since="12 months ago")
    for commit in all_commits:
        for file in commit.changed_files:
            total_changes_per_file[file] += 1

    # Calculate bug fix ratio per file
    hotspots = []
    for file, bug_count in bug_fixes_per_file.items():
        total_count = total_changes_per_file.get(file, bug_count)
        bug_ratio = (bug_count / total_count) * 100

        # Hotspot threshold: >10 bug fixes AND >50% ratio
        if bug_count > 10 and bug_ratio > 50:
            hotspots.append({
                'file': file,
                'bug_fixes': bug_count,
                'total_changes': total_count,
                'bug_ratio': bug_ratio,
                'severity': 'CRITICAL' if bug_ratio > 70 else 'HIGH'
            })

    return sorted(hotspots, key=lambda x: x['bug_fixes'], reverse=True)

Step 4: Track Trends Over Time

Monthly breakdown:

def calculate_monthly_trends(months=12):
    trends = []

    for i in range(months):
        start_date = get_date_n_months_ago(i + 1)
        end_date = get_date_n_months_ago(i)

        month_data = calculate_unplanned_ratio_for_period(start_date, end_date)

        trends.append({
            'month': start_date.strftime('%Y-%m'),
            'unplanned_ratio': month_data['unplanned_ratio'],
            'unplanned_count': month_data['unplanned'],
            'total_commits': month_data['total_commits']
        })

    return trends

Output Format

1. Executive Summary

Unplanned Work Analysis (forensic-unplanned-work pattern)

Period: Last 12 months
Total Commits: 1,247
Unplanned Work: 418 commits (33.5%)

Classification:
  - Unplanned (bugs/​hotfixes): 418 (33.5%) - HIGH
  - Planned (features): 682 (54.7%)
  - Refactoring: 98 (7.9%)
  - Unknown: 49 (3.9%)

Research shows >40% unplanned work correlates with low morale (DevOps).

VELOCITY IMPACT:
  Team Size: 5 developers
  FTE on Unplanned Work: 1.7 developers (33.5% × 5)
  Opportunity Cost: ~3-4 features not delivered per quarter

TREND: ⬆️ INCREASING (was 28% six months ago)
  → Quality degrading, technical debt accumulating

2. Interrupt Hotspots (Files Causing Most Bugs)

Files Generating Most Unplanned Work:

Rank | File                     | Bug Fixes | Total Chg | Ratio | Impact
-----|--------------------------|-----------|-----------|-------|--------
1    | auth/​authentication.js  | 28        | 42        | 67%   | 🚨 CRITICAL
2    | api/​payments.js         | 23        | 38        | 61%   | 🚨 CRITICAL
3    | models/​user.js          | 19        | 32        | 59%   | ❌ HIGH
4    | utils/​validation.js     | 15        | 25        | 60%   | ❌ HIGH

Research: 80-90% of bugs come from 20% of files (Pareto).

RECOMMENDATION: These 4 files are interrupt hotspots
  - 85 bug fixes total (20% of all unplanned work)
  - Refactoring these would significantly reduce interrupt work

3. Monthly Trend Analysis

Unplanned Work Trend (12 months):

Month     | Unplanned % | Commits | Unplanned | Trend
----------|-------------|---------|-----------|-------
2024-01   | 28%         | 98      | 27        | ━━━━━━━━━━━━━━━━━━━━━━━━━━━
2024-02   | 29%         | 102     | 30        | ━━━━━━━━━━━━━━━━━━━━━━━━━━━━
2024-03   | 31%         | 105     | 33        | ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
2024-04   | 33%         | 108     | 36        | ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
2024-05   | 35%         | 110     | 39        | ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
2024-06   | 37%         | 104     | 38        | ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
...

TREND ANALYSIS:
  - ⬆️ INCREASING: +9% over 12 months (28% → 37%)
  - Pattern: Steady degradation, not seasonal
  - Impact: Quality declining, velocity suffering

INFLECTION POINT: March 2024 (ratio started accelerating)
  - Possible cause: Major feature release without quality time?

Research: 10% reduction in unplanned work = 15-20% more features (Google SRE).

4. Velocity Impact Calculation

PRODUCTIVITY IMPACT ANALYSIS:

Team Capacity:
  - Team Size: 5 developers
  - Sprint Capacity: 100 story points
  - Velocity: ~25 points per developer per sprint

Current State (33.5% Unplanned):
  - Unplanned Capacity: 33.5 points (33.5% × 100)
  - Planned Capacity: 66.5 points
  - FTE on Firefighting: 1.7 developers

If Reduced to 20% Unplanned:
  - Unplanned Capacity: 20 points (-13.5)
  - Planned Capacity: 80 points (+13.5)
  - FTE Freed Up: 0.7 developers
  - Additional Features: ~3-4 per quarter

ANNUAL OPPORTUNITY COST:
  - Lost Features: ~12-16 features/​year
  - Developer Time: 1.7 FTE × $150K = $255,000/​year
  - Actual Value: $170,000/​year on unplanned work

RECOMMENDATION: Invest in quality to reduce unplanned work
  - ROI: 10% reduction = 15-20% more features (Google SRE)

Common Mistakes

Mistake 1: Not tracking trends over time

Problem: Only looking at current ratio, missing degradation pattern.

# ❌ BAD: Single snapshot
unplanned_ratio = 33.5%

# ✅ GOOD: Trend analysis
monthly_ratios = [28%, 29%, 31%, 33%, 35%, 37%]
trend = INCREASING (+9% over 6 months)

Fix: Always track trends - increasing ratio indicates quality degrading.

Mistake 2: Not correlating with code hotspots

Problem: Reporting unplanned work without identifying which files cause it.

# ❌ BAD: Just overall ratio
report("33.5% unplanned work")

# ✅ GOOD: Identify interrupt hotspots
find_files_with_most_bug_fixes()
correlate_with_hotspot_analysis()

Fix: Always identify interrupt hotspots - 80-90% of bugs come from 20% of files.

Mistake 3: Not quantifying velocity impact

Problem: Presenting ratio without translating to business impact.

Fix: Calculate:

  • FTE on unplanned work: ratio × team size
  • Lost features: unplanned capacity / average feature size
  • Opportunity cost: FTE × average salary
  • Always translate to dollars and features for executives

Mistake 4: Not checking commit classification accuracy

Problem: Trusting automated classification without validation.

Fix: Sample validation:

  • Manually review 50 random commits
  • Check if classification matches reality
  • Adjust keywords based on team's conventions
  • Report accuracy percentage (e.g., "85% classification accuracy")

⚡ After Running Unplanned Work Analysis (DO THIS)

Immediately suggest these next steps to the user:

  1. Correlate with code hotspots (use forensic-hotspot-finder)

    • Are interrupt hotspots also code hotspots?
    • High churn + high bugs = critical refactoring target
    • Pareto principle: Fix 20% of files to reduce 80% of bugs
  2. Calculate refactoring ROI (use forensic-refactoring-roi)

    • Unplanned work cost = annual waste
    • Refactoring interrupt hotspots = reduced bug rate
    • ROI typically very high (bugs are expensive)
  3. Track quality trends (use forensic-complexity-trends)

    • Is complexity increasing in interrupt hotspots?
    • Validate that refactoring reduces both complexity AND bugs
    • Monitor monthly to ensure quality improving
  4. Re-run quarterly to measure improvement

    • Did refactoring reduce unplanned work ratio?
    • Track trend: improving, stable, or deteriorating?
    • Validate ROI predictions with actual results

Example: Complete Unplanned Work Analysis Workflow

"Using forensic-unplanned-work pattern, I analyzed 1,247 commits over 12 months.

UNPLANNED WORK RATIO: 33.5% (HIGH)

Classification:
  - Unplanned (bugs): 418 commits (33.5%)
  - Planned (features): 682 commits (54.7%)

Research shows >40% unplanned work correlates with low morale (DevOps).

TREND: ⬆️ INCREASING (+9% over 12 months, from 28% to 37%)
  → Quality degrading, velocity suffering

INTERRUPT HOTSPOTS:

authentication.js: 28 bug fixes (67% of changes are fixes)
payments.js: 23 bug fixes (61%)
user.js: 19 bug fixes (59%)

These 3 files = 70 bug fixes (17% of all unplanned work)

VELOCITY IMPACT:
  - 1.7 FTE firefighting (33.5% × 5 developers)
  - Opportunity cost: ~12-16 lost features/​year
  - Research: 10% reduction = 15-20% more features (Google SRE)

NEXT STEPS:
1. Check hotspots (forensic-hotspot-finder) - Are these also high-churn?
2. Calculate ROI (forensic-refactoring-roi) - Business case for cleanup
3. Track complexity (forensic-complexity-trends) - Are they deteriorating?
4. Re-run quarterly - Validate improvement

Would you like me to proceed with hotspot correlation?"

Always provide this integration guidance - unplanned work directly impacts team velocity and morale.

Advanced Patterns

Virtuous vs Vicious Cycle Detection

Quality investment impact:

VICIOUS CYCLE (Current State):
  High unplanned work (37%)
    → Less time for quality
    → More technical debt
    → More bugs
    → Even higher unplanned work (cycle continues)

VIRTUOUS CYCLE (After Quality Investment):
  Reduce unplanned work (20%)
    → More time for quality
    → Less technical debt
    → Fewer bugs
    → Even lower unplanned work (improving)

BREAK POINT: Need initial quality investment to break vicious cycle

Post-Release Spike Analysis

Detect release quality issues:

Unplanned Work Around Releases:

Release 2.0 (Mar 15):
  Week before: 25% unplanned
  Week after: 48% unplanned (+92% spike)
  Following month: 41% unplanned

Pattern: Major releases followed by bug spikes
Recommendation: Increase QA before releases, stabilization sprints

Team Morale Correlation

Estimate morale impact:

Unplanned Work vs Team Sentiment:

Jan-Mar (28% unplanned): High morale, good velocity
Apr-Jun (35% unplanned): Declining morale, complaints about firefighting
Jul-Sep (41% unplanned): Low morale, attrition concerns

Research correlation: >40% unplanned = low morale (DevOps)

CURRENT: 37% (approaching morale threshold)
ACTION: Reduce unplanned work before reaching 40%

Research Background

Key studies:

  1. DevOps Research & Assessment (DORA, 2019): Unplanned work and morale

    • 40% unplanned work correlates with low team morale

    • High-performing teams: 10-20% unplanned
    • Recommendation: Monitor unplanned work as quality metric
  2. Google SRE (2017): Quality investment ROI

    • 10% reduction in unplanned work = 15-20% increase in feature delivery
    • Quality investment has compounding returns
    • Recommendation: Dedicated quality time in sprints
  3. Pareto Principle (Software Engineering Application): Bug distribution

    • 80-90% of bugs come from 20% of files
    • Recommendation: Focus quality efforts on interrupt hotspots
  4. Technical Debt Research (Kruchten et al, 2012): Debt and velocity

    • Technical debt manifests as increased unplanned work
    • Unplanned work ratio is leading indicator of debt accumulation
    • Recommendation: Track ratio monthly as health metric

Why unplanned work matters: It's the most visible symptom of technical debt - directly impacts velocity, morale, and business delivery.

Integration with Other Techniques

Combine unplanned work analysis with:

  • forensic-hotspot-finder: Interrupt hotspots are often code hotspots
  • forensic-refactoring-roi: Reducing unplanned work has high ROI
  • forensic-complexity-trends: Track if quality improving reduces bugs
  • forensic-debt-quantification: Unplanned work = quantifiable debt cost

Why: Unplanned work is the outcome metric that validates all other forensic analyses - if unplanned work decreases after refactoring, you've succeeded.

More skills from majiayu000

xiaohongshu logo
majiayu000/claude-arsenal

xiaohongshu

xiaohongshu

286 148
View
agent-task-conductor logo
majiayu000/claude-skill-registry

agent-task-conductor

Conduct multi-agent task orchestration and workflow coordination.

663 1
View
conductor-setup logo
majiayu000/claude-skill-registry

conductor-setup

Initialize project with Conductor artifacts (product definition,

663 1
View
animation-designer logo
majiayu000/claude-skill-registry

animation-designer

Expert in web animations, transitions, and motion design using Framer Motion and CSS

663 1
View
diagramming logo
majiayu000/claude-skill-registry

diagramming

Creates Mermaid and ASCII diagrams for flowcharts, architecture, ERDs, state machines, mindmaps, and more. Use when user mentions diagram, flowchart, mermaid, ASCII diagram, text diagram, terminal diagram, visualize, C4, mindmap, architecture diagram, sequence diagram, ERD, or needs visual docume...

663 1
View
h3-pg logo
majiayu000/claude-skill-registry-data

h3-pg

PostgreSQL bindings for H3 hexagonal grid system. Use when working with H3 cells in Postgres, including spatial indexing, geometry/geography integration, and raster analysis.

23 1
View
conductor-development logo
majiayu000/claude-skill-registry

conductor-development

Context-Driven Development skill for projects using Conductor. Use this skill when you detect a `conductor/` directory in the project, when working on tasks defined in a `plan.md` file, or when the user asks about tracks, specs, or plans. Automatically applies TDD workflow, tracks task completion...

663 1
View
conductor-status logo
majiayu000/claude-skill-registry

conductor-status

Display project status, active tracks, and next actions

663 1
View
dockerization logo
majiayu000/claude-skill-registry

dockerization

Official Stakpak application containerization standard operating procedure, a step-by-step guidline to properly dockerize applications. This is a rule book curated by the Stakpak Team.

663 1
View

Popular AI tools

Kaiber logo
Video

Kaiber

Generate, edit, and beat-sync AI video with leading models in one workspace.

Paid
View
Vimcal logo
Productivity

Vimcal

The world's fastest calendar for remote work

Free
View

Transform Your Design with AI Designer by ImgCreator.ai

Freemium
View
Akool AI logo
Content & writing

Akool AI

Revolutionizing Video Production with AI-Powered Creativity

Paid
View

Extend an image past the frame and let AI fill the new aspect ratio.

Freemium
View
StarByFace logo
Security

StarByFace

Discover your celebrity doppelgänger with StarByFace!

Free
View
C

ChainClarity explains 700+ crypto whitepapers in plain English, with layered summaries, comparisons, research tools, alerts, and a $4.99 Pro plan.

Freemium
View
Opus Clip logo
Coding & apps

Opus Clip

Opus.ai: Revolutionize Your Web Experience

Free
View