Downloads · 30 days
5
12% of all-time downloads
clamsproject/bert-base-cased-ner-rfb
bert-base-cased-ner-rfb is a token classification model from clamsproject. Use it when you need labels on individual words, such as names. It is set up for transformers. The card lists the license as apache-2.0.
This model is a fine-tuned version of bert-base-cased on a private dataset.
Downloads · 30 days
5
12% of all-time downloads
All-time downloads
43
Public
Parameters
108M
1.3 GB on disk
Likes
0
Public
Click a slice to open those files.
.pt862 MB · 67%
From the Hugging Face model README
This model is a fine-tuned version of bert-base-cased on a private dataset.
It achieves the following results on the evaluation set:
It achieves the following results on the test set:
More information needed
More information needed
More information needed
The following hyperparameters were used during training: